Since I just posted pictures of Ada in our bathroom, I thought now would be the time to share this old post I had saved 🙂 The first picture is how it looked when we bought it, then we painted before moving in which is the second picture. The renovation started in 2009.
We are in the middle of a 2 year master bathroom project. It all started after we felt a soft spot in the floor around the toilet. Todd ripped up part of the vinyl and found water & mold damage. From there we decided that a new toilet and flooring were needed, but the floor went under the cabinets so we decided to replace those too.
It has taken us quite awhile and we still have a few more things to do, such as replacing the tub, shower tile, baseboards and exhaust fan. I’ll have more pictures when it is all complete, but here is a sneak peak.